Work

VIO Office SpaceCAT A case study.

Design, Fit-out

VIO Office Space

Refurbishment project for our esteemed client, VIO Office, located in their Bath Street office where several of the buildings have been designated as Grade I listed buildings. Vio office offers a range of self-contained serviced office suites, providing a personalised and bespoke experience for their clients!

Arrow link.
Darwin HouseCAT A case study.

DILAPIDATION WORK, Strip out of 4 floors, Full decoration

Darwin House

Project-XV transforms Darwin House: window refurbishment and decoration, external decoration, floor strip-out, 2nd floor subdivision, full interior decoration, new carpets.

Arrow link.
Beacon Tower 8th floor and communal areasCAT A case study.

Flooring, spot lighting, Cat-a fit-out

Beacon Tower 8th floor and communal areas

Beacon Tower's 8th floor was stripped back with a comprehensive refurbishment while also redesigning WC's, lift lobbies, and implementing a modern CAT-A fit-out.

Arrow link.
Helastel - Beacon Tower 5th floorCAT A case study.

CAT-A Fit-out

Helastel - Beacon Tower 5th floor

Transform former tenant space into a modern, flexible, and refurbished floor for incoming tenants.

Arrow link.
Unit 4 Severn Bridge Industrial EstateCAT A case study.

CAT-A Fit-out

Unit 4 Severn Bridge Industrial Estate

70,000 sq ft refurbishment of unit 4 for FIREM to showcase expertise in premium industrial spaces.

Arrow link.
West Point RowCAT A case study.

Flooring, Suspended ceilings

West Point Row

Project-XV refurbished West Point Row's unit 4 in 4 weeks, including strip out, new ceilings, flooring and kitchen.

Arrow link.
3 Newbridge SquareCAT A case study.

CAT-A

3 Newbridge Square

3 Newbridge Square underwent a large refurbishment program including replacement of HVAC.

Arrow link.