Project Overview

In collaboration with the incoming Helastel, who played a pivotal role in the finished specification of 5th floor, Beacon Tower. The focus was on creating modern meeting rooms and breakout zone with a flexible open-plan office space spanning 4,230 sq ft across the 5th floor.

No items found.
Challenges and Objectives

The project was twofold, to complete the landlord works while also liaising and undertaking works for the incoming tenant keeping the original timelines.

No items found.
Results

The investment made by Beacon Tower in the refurbishment aided the lease signing by Helastel. By working for both landlord and tenant costs were reduced to both parties with significant reduction in time over what would be two projects.

No items found.

More Case Studies

Ty Gwent, Cwmbran

Design, Fit-out

Ty Gwent, Cwmbran

To attract tenants to Ty Gwent, a 35,287 sq ft office space at Llantarnam Business Park.

Arrow link.
Beacon Tower 8th floor and communal areas

Flooring, spot lighting, Cat-a fit-out

Beacon Tower 8th floor and communal areas

Beacon Tower's 8th floor was stripped back with a comprehensive refurbishment while also redesigning WC's, lift lobbies, and implementing a modern CAT-A fit-out.

Arrow link.