Revitalise Your Office Space

We are refurbishment experts that specialise in creating spaces that empower its users and aids in the growth of businesses.

Get in touch
CAT A case study.
Experience and Expertise

Tailored Approach

Creating personalised spaces by understanding your brand, ethos and goals

Turn-key Service

Offering design concept through to project delivery

Competitive Pricing

Affordable and cost-effective solutions

Innovative and Forward-thinking

Proven success in any refurbishment project

Exceptional customer service

Driving industry innovation and progress

A large empty and bright office space with room size windows.CAT A case study.

Some of Our Work

Photo of Tria's office space with three colourful and comfortable chairs. Green walls with a TV attached. Working station in the background.

DESIGN & FIT-OUT

Crux Product Design

Having previously served as home to The Royal Photographic Society, Crux engaged with Project XV to transform their 8,000 sq ft new purchase into functional, contemporary office and lab space to sit alongside their existing office. Amongst installing new partitioning, replacing M&E and redecoration throughout, the works also included altering the existing auditorium and exhibition hall into space that Crux could incorporate as part of their design and engineering function.

With a limited timeframe instruction to the grand opening, we worked closely with the client to ensure we hit all timescales were managed and successfully met. It has been great to work with such an exciting, fast growing, Bristol based company and we hope they enjoy their new home!

A collage of images on Tria's office wall.
Man editing music in a studio.CAT A case study.
Man doing street art (graffity) in a room.CAT A case study.

Fit-out

Kiwis Bowls

A fresh new addition to Cardiff's food scene, Kiwis Bowls has opened its doors in the heart of Central Square at Cardiff's bus interchange. 

The refurbishment has created an inviting environment featuring a generous food counter, coffee bar, and integrated seating area, offering visitors a healthy breakfast or lunch option just moments from Cardiff Central Station.

The fit-out included a full MEP package, raised access flooring and floor finishes, new partitions, the creation of DDA-compliant WCs, and the installation of bespoke counters and seating. 

Completed in just 10 weeks, the project was handed over ahead of schedule to support the grand opening in time for the 2026 HYROX Cardiff 2026 event.

Design & Fit-out

Beacon Tower
Large open office space with modern colourful chairs and a kitchen.CAT A case study.

Since 2018 we have refurbished a number of floors across the 16 storey Beacon Tower on tenants lease expiration taking the floor plates as they become vacant. The floor spaces have been taken back to an industrial look with exposed services, new ducted heating and cooling system, replacement windows, low level trunking with power and CAT 6 data plus LED baton lights.

We have also fully refurbished 16 storeys of toilets from the dated look to a modern light and airy space. Main stacks and pipework has been replaced as the former cast iron pipework was in need to significant repair. New sanitaryware has been installed along with new toilet cubicles, sanitaryware, flooring, backlit mirrors and hand dryers.

Streamlined
Refurbishment Process

Our team is equipped to handle any type of refurbishment project, large or small, and is committed to delivering exceptional results every time. Trust us to bring your workspace up to date and support your business growth.

1.  Creating a brief

We always start with understanding what are you looking to achieve by making this change? We’ll establish your goals in order to create a meaningful, lasting change with our designs.

2.  Developing the concept

We’ll create a 2D architectural plan alongside an inspiring vision board. Including featured products, lighting, flooring and decorative ideas.

Once you’re completely confident in your concept we create sections of your office in 3D renders to show you the finished space. We can even offer 3D walk-throughs.

3.  Implementation

Following a diligent design and preparation stage your scheme will move smoothly into our procurement and build process. It’s construction time.

Step back and let our fitters do their thing as they get to work, top to bottom. Fitting new ceilings, walls, floors, doors, plumbing, electrics and kitchens - there’s nothing they can’t do. All whilst coordinating the smooth running of materials arriving on site.

 David Kirkpatrick

Director at Tria Recruitment

David Kirkpatrick

"I’ve worked with Paul for many years now and have always been impressed with his professionalism and attention to detail. Our recent project was to expand our office space and do a completely new refurbishment working to pretty tight timescales. The Project XV team were brilliant from start to finish, initially consulting on the best design and layout in a cost effective way and through the build phase, always updating me every step of the way and dealing with the challenges in a professional manner. We are absolutely delighted with the results and I couldn’t recommend Project XV highly enough. I think this is the best fitout in our building."

Gavin Baos

Partner at Penguin Wealth Management

Gavin Baos

"Project XV were engaged by Penguin via recommendation from a mutual client. They were brought in to look at our existing office to redesign due to our expansion and brand refresh. the design stage was detailed with 3D visuals and walkthrough video allowing us to visualise the finished space. Regular updates were provided through the build with regular site meetings and weekly progress reports. The office has exceeded our expectation, the team at Penguin are delighted with the results."

Arrow link.

Get in touch

Transform your property with our expert refurbishment services, get in touch today for a free consultation.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
A very comfortable couch in Tria's office space with lit up LED triangles and grass on the wall.CAT A case study.