Project Overview

FI Real Estate Management (FIREM), successfully refurbished Unit 4 at Severn Bridge Industrial Estate. The primary objective was to attract a tenant for the last remaining unit, requiring a comprehensive 12-week overhaul of both the exterior and interior spaces.

No items found.
Challenges and Objectives

The project aimed to enhance the property's appeal and provide high-quality facilities to meet the needs of potential occupiers. Key challenges included ensuring a swift turnaround and creating a space that aligns with the requirements of the incoming tenant, a haulage and logistics company set to occupy the unit.

No items found.
Results

The Lockwood Group signed a minimum five-year lease for the fully refurbished Unit 4, marking the full occupancy of Severn Bridge Industrial Estate. The successful collaboration showcased the capability to meet industry demands for premium industrial spaces.

No items found.

More Case Studies

Beacon Tower 8th floor and communal areas

Flooring, spot lighting, Cat-a fit-out

Beacon Tower 8th floor and communal areas

Beacon Tower's 8th floor was stripped back with a comprehensive refurbishment while also redesigning WC's, lift lobbies, and implementing a modern CAT-A fit-out.

Arrow link.
Design Group

Design, Fit-out, Partitioning

Design Group

We successfully completed a 3-phase refurbishment of the Design Group HQ. The project involved updating key office areas with new lighting, flooring, partitions, furniture, and full redecoration. Despite tight deadlines, Project XV delivered high-quality results, with the client praising their adaptability and communication throughout the process.

Arrow link.