Project Overview

FI Real Estate Management (FIREM), successfully refurbished Unit 4 at Severn Bridge Industrial Estate. The primary objective was to attract a tenant for the last remaining unit, requiring a comprehensive 12-week overhaul of both the exterior and interior spaces.

No items found.
Challenges and Objectives

The project aimed to enhance the property's appeal and provide high-quality facilities to meet the needs of potential occupiers. Key challenges included ensuring a swift turnaround and creating a space that aligns with the requirements of the incoming tenant, a haulage and logistics company set to occupy the unit.

No items found.
Results

The Lockwood Group signed a minimum five-year lease for the fully refurbished Unit 4, marking the full occupancy of Severn Bridge Industrial Estate. The successful collaboration showcased the capability to meet industry demands for premium industrial spaces.

No items found.

More Case Studies

Parkhouse

Parkhouse

Parkhouse

Project XV worked in close partnership with Rhian Worgan Interior Design to transform the reception area and ground floor suite of a commercial property. The aim was to enhance both functionality and aesthetic appeal, creating a cohesive and welcoming environment for current and prospective tenants.

Arrow link.
Enterprise Rent-A-Car

Design, Fit-out

Enterprise Rent-A-Car

Enterprise Rent-A-Car renovated branches to improve service, HQ used bright colours for standout space.

Arrow link.