Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

Orchard

Decoration, Flooring, Furniture, Bespoke booths, Tea points

Orchard

We consider the whole of Orchard’s workspace. From the moment you step through the door to the second you leave, every detail matters, from the entrance to the meeting rooms. The workspace has been transformed into a dynamic and inviting environment that prioritises employee satisfaction and productivity.

Arrow link.
Design Group

Design, Fit-out, Partitioning

Design Group

We successfully completed a 3-phase refurbishment of the Design Group HQ. The project involved updating key office areas with new lighting, flooring, partitions, furniture, and full redecoration. Despite tight deadlines, Project XV delivered high-quality results, with the client praising their adaptability and communication throughout the process.

Arrow link.