Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

Sift, Bristol

Design, Fit-Out

Sift, Bristol

To support Sift’s relocation to a 6,000 sq ft space prompted by team expansion.

Arrow link.
Finzels

Dilapidation Work, Cat A+

Finzels

A sensitive upgrade of a historic space, this project balanced essential landlord works with design-led enhancements to create a high-quality, ready-to-let workspace within a listed building.

Arrow link.