Project Overview

The project included the redesign and refurbishment of WC's, replacement of cast iron pipework, installation of new sanitary ware, flooring, backlit mirrors, and hand dryers. The lift lobbies were reimagined with new bulkheads and strip and spot lighting to enhance the overall aesthetic.

No items found.
Challenges, Objectives and Results

The challenge was to modernise and elevate the 8th floor space, ensuring a seamless blend of functionality and aesthetics. The CAT-A fit-out, featuring exposed services, new heating and cooling systems, replacement windows, low-level trunking, and LED baton lights, contributes to a dynamic and industrially inspired workspace.

No items found.

No items found.

More Case Studies

3 Newbridge Square

CAT-A

3 Newbridge Square

3 Newbridge Square underwent a large refurbishment program including replacement of HVAC.

Arrow link.
Newminster House - Egis

Dilapidations, Fitout

Newminster House - Egis

Project XV were appointed by both the landlord and tenant to manage the dilapidation and transformation of three previously subdivided suites. The scope involved opening up the floor plate to create a unified space for a single incoming occupier.

Arrow link.